baby blue ball Hospitals Home Page
baby blue ball Applications/Licensure Requirements
baby blue ball Change Notification
baby blue ball Complaints - How to file
baby blue ball Contact Information
    Contact Us
    Other Contacts
baby blue ball Disciplinary Actions
baby blue ball Duplicate License
baby blue ball Fees
baby blue ball Food Service Code Book
baby blue ball Inspections
baby blue ball Labels and Listings
baby blue ball Medicare/Medicaid Certification
baby blue ball Regulations
Statutes
baby blue ball Rosters of Health Care Facilities and Services

Hospitals
Inspections

To determine compliance with operational, care, treatment and physical plant standards, the Department inspects the hospital prior to and following licensure. The Department determines compliance through on-site inspections, review of schematic and construction plans, and reports of qualified inspectors.

Initial Inspections (pdf icon 175 NAC 9 Sections 005.01-005.02E):

The Department must conduct an initial on-site inspection to determine compliance with 175 NAC 9 Sections 006 and 007. The inspection must occur within 30 working days, or later if requested by the applicant, of receipt of a completed application for an initial license. The Department must provide a copy of the inspection report to the hospital within ten working days after completion of an inspection.

Physical Plant Inspections (175 NAC 9 Sections 005.03-005.03B2):

The Department must conduct inspections for conformity with construction plans and compliance with pdf icon 175 NAC 9 Section 007 at new facilities or new construction prior to use or occupancy.

Compliance Inspections (175 NAC 9 Sections 005.04-005.06B):

The Department may conduct an onsite inspection at any time as deemed necessary.

crl divider

Facilities and Services Home

Licensure Unit

Documents in PDF PDF format require the use of Adobe Acrobat Reader

which can be downloaded for free from Adobe Systems, Inc.